{"id":4142,"date":"2023-02-22T11:16:13","date_gmt":"2023-02-22T11:16:13","guid":{"rendered":"https:\/\/westa.solar\/?p=4142"},"modified":"2023-02-28T11:37:39","modified_gmt":"2023-02-28T11:37:39","slug":"westa-solar-increases-its-installed-solar-capacity-in-nigeria-to-1-6mw-in-2022-with-commissioning-of-2-new-sites","status":"publish","type":"post","link":"https:\/\/westa.solar\/?p=4142","title":{"rendered":"WESTA.SOLAR INCREASES ITS INSTALLED SOLAR CAPACITY IN NIGERIA TO 1.6MW IN 2022, WITH COMMISSIONING OF 2 NEW SITES."},"content":{"rendered":"\n<p><a href=\"https:\/\/westa.solar\/\">westa.solar<\/a>, a leading clean energy company that offers an all-inclusive solar Power Purchase Agreement (PPA), proudly announces the commissioning of a 148kWp solar installation at&nbsp;<a href=\"https:\/\/www.frootmultitradeng.com\/\">Froot<\/a>&nbsp;<a href=\"https:\/\/www.frootmultitradeng.com\/\">Multitrade<\/a>&nbsp;<a href=\"https:\/\/www.frootmultitradeng.com\/\">Nigeria Limited<\/a>&nbsp;and a 600kWp solar installation at&nbsp;<a href=\"https:\/\/www.sacvin.com\/\">Sacvin<\/a>&nbsp;<a href=\"https:\/\/www.sacvin.com\/\">Nigeria limited<\/a>.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/techcabal.com\/2023\/02\/21\/westa-solar-increases-its-installed-solar-capacity-in-nigeria-to-1-6mw-in-2022-with-commissioning-of-2-new-sites\/\" target=\"_blank\" rel=\"noreferrer noopener\">Read more &#8230;<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>westa.solar, a leading clean energy company that offers an all-inclusive solar Power Purchase Agreement (PPA), proudly announces the commissioning of a 148kWp solar installation at&nbsp;Froot&nbsp;Multitrade&nbsp;Nigeria Limited&nbsp;and a 600kWp solar installation [&hellip;]<\/p>\n<p><a href=\"https:\/\/westa.solar\/?p=4142\" class=\"more-link style2-button\">Read More<\/a><\/p>","protected":false},"author":1,"featured_media":4156,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[36],"tags":[],"class_list":["post-4142","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-36"],"_links":{"self":[{"href":"https:\/\/westa.solar\/index.php?rest_route=\/wp\/v2\/posts\/4142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/westa.solar\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/westa.solar\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/westa.solar\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/westa.solar\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4142"}],"version-history":[{"count":3,"href":"https:\/\/westa.solar\/index.php?rest_route=\/wp\/v2\/posts\/4142\/revisions"}],"predecessor-version":[{"id":4186,"href":"https:\/\/westa.solar\/index.php?rest_route=\/wp\/v2\/posts\/4142\/revisions\/4186"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/westa.solar\/index.php?rest_route=\/wp\/v2\/media\/4156"}],"wp:attachment":[{"href":"https:\/\/westa.solar\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/westa.solar\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/westa.solar\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}