westa.solar COMMISSIONS A 120kWh PV-BESS SYSTEM USING THE CUTTING EDGE HUAWEI’S POWER-S SOLUTION IN LAGOS, NIGERIA
With the recent upward tariff review for Band A customers of the Distribution Companies (DisCos), and the continuous changes in diesel prices over the past months, energy has become even less affordable for both commercial and industrial end users across the nation. The need for a more affordable and sustainable energy solution has never been as pressing as it is now.
At westa.solar, we are committed to addressing this crucial need by developing custom Solar Energy solutions that allow our clients save costs while enjoying stable power from a reliable source, alongside invaluable environmental benefits.
We are therefore delighted to announce the commissioning of a 120kWh PV-BESS system to supply a clean energy mix for a client in Lagos, Nigeria, using the cutting-edge technology of Huawei’s Power-S solution.
The hybrid Huawei Power-S system integrates other power sources such as the national grid and diesel generator and intelligently optimizes the consumption from Solar power and the Battery Energy Storage Solution (BESS), enabling the client to enjoy a continuous supply of energy all through the day and night while saving significant on energy cost.
This solution will displace up to 53 MT of CO2 per annum, which is equivalent to 12 years of CO2 emissions from a passenger car.